Planning on using the Sultan Road from June 15 – 17?

0

The Eacom Timber Corporation is advising the users of the Sultan Industrial Road of a roadwork-related closure that will take place from June 15th to 17th, 2016.

“Work will be done between kilometers 54 and 77, and the whole section will be closed. While thoroughfare will be blocked, the sections to the East and West of the work area will be left open for public circulation.”

The Woman River bridge at KM54 is being repaired, as is the Wakami Bridge at the CPR tracks (Sultan) KM 77. A culvert is also being replaced at KM 57.

LEAVE A REPLY

Please enter your comment!
Please enter your name here